Saturday, October 30, 2010

Fix Salon Haircut Prices

L'Institut de France and Pont des Arts. Notre Damme







A boat trip along the Seine appeared this dome before crossing under the bridge.


I have the pencil sketch, then to make the first layer aguarrasada with an old brush and dragged hard graphite pencil contornos.Al outlining the same time, giving an initial assessment tonal.Ahora see the flashlight I have to flatten slightly.


My intention is to finish the painting in one sitting, working quickly.


Today I continued the cuadro.Primero the sky (clear ultramarine blue, indigo, lac, titanium white), I have been very dark, there was no contrast to the dome, in the end I decided to remove it with turpentine. I followed with the architecture (Cadmium yellow, yellow ocher, lacquer, ultramarine blue, permanent violet, white titanium) I've worked a lot faster this area covering the planes and contours that are not outlined in negro.Me looked like that efecto.He more colorful effect that dwell on the color used detalles.He almost straight tube, and I restrgado with an old brush hair duro.Conclusión: I found an interesting method to architectural structures, but that does not fit plans are not limited as mares.Este heavens or method could be interesting in painting frutas.tiene the advantage that the drawing is not, quite the opposite is enhanced giving the appearance naive painting, where color takes center stage without losing lines.
I have painted the sky cadmium yellow, dark yellow ocher, red ocher, a pinch of white lacquer and titanio.Creo that there is more harmony of color, contrast complementary in this case.

Sunday, October 17, 2010

Cervical Mucus Before A Period

CONSTRUCTION PROCESS OF JOIST SLAB and vault

construction process and vault JOIST SLAB

This system constructive has the advantage of building slabs without Cimbrian that to support the arches into the joists entire surface is covered.

The joists are supported on walls or beams, bracing temporarily.

The items light are the arches resting on the joists, lighten the slab and serve formwork to concrete cast on site.

A mesh layer electro welded extends throughout the slab, on elements light to serve as reinforcement against temperature effects as compression layer.

The slab is integrated into the structure the walls and castles through specific channels (channels enclosure) that slip on the walls the perimeter.

On this particular school whole to fill the veins and form a compression layer on light elements (with a minimum thickness of three centimeters).

SLAB STEPS TO BUILD A ceiling joist and vault:


STEP 1: SHORING

braces are placed and support beams and leveling. and removed after 7 days of strained layer compression. poles are placed 4 "x 4" each 1.50m and beams of the same section each 1.60m to serve as provisional support to the joists.





STEP 2: PLACEMENT OF JOISTS

Place joists supported on the walls we have defined as Chargers our slab. joists manually placed boots on the walls. From wall boot placed the first joist . NOTE: It is recommended that compression strain layer beams with or chains enclosure. . The joists should be supported on the walls or at least elements loaders inches. For example if you have a clear free three meters more inches support on each wall, joist required must have 3.10m total length





STEP 3: ALIGN JOISTS

slabs are placed at the ends of the beams to obtain the correct separation of these also facilitate the subsequent placement of other slabs in alignment.




STEP 4: PUT Cove

caring slabs are placed firmly seated and close together. placement also done manually.





STEP 5: ATTACH WIRING

After the vaults have been in place, hoses are placed for electrical installation. These put on the walls and bovedillas.Donde holes of output required for an outbreak that vault is removed, the installation gets to the output of focus, put under an arch and then you reinforce it with small rods or mesh the hole and then just puts his cast concreto.Asi also carried out the hydraulic and necessary health.



STEP 6: PLACE MESH WELDED

short is presented and the required size and tied with wire annealing top rod of the joists and chains enclosure. NOTE: layers 3 to 4 cm wire mesh is recommended - welded 66x10x10 and 5 cm layers of welded wire mesh 66x8x8. The welded wire mesh on the floor is cut to size, later climbs the slab under construction and tied with wire annealed to the upper rod joists and chains enclosure.





STEP 7: STRAINED LAYER COMPRESSION

holes are plugged at the ends of the slabs and / or those that have been cropped to fit the clear. It perfectly wet joists and slabs and cast of 3 to 5 cm of concrete according to the mesh. It recommended to wet the arches to get greater adhesion with the compression layer. The concrete must have a minimum strength of F ° C = 200 kg/cm2. This step of the casting layer compression layer (concrete) should be performed in a single operation.





----------------- --------------------------------------------------


---------------------------------- RESOLVED EXAMPLES OF PHYSICAL PROPERTIES OF SOIL:

http://suelos56.blogspot.com/


RESOLVED EXAMPLES OF SOIL CONSOLIDATION AND SETTLEMENT: http://consolid123.blogspot.com/

EXAMPLES OF RETAINING WALLS AND THRUST OF LAND : http: / / contencion27.blogspot.com /

--------------------------------------- ----







slab construction process of beam and vault, construction of beam and vault slab, slab joist and vault, beam and vault ceiling, beam and vault

Sunday, October 10, 2010

Pinnacle Tv Center Windows 7 Problem

from the Seine

















View Notre Damme from Sena.Es impressive architecture of the cathedral with its arbotantes.Ya is raised theme: the cathedral as the centerpiece, the sky has a key role (occupies half the canvas), the trees, the buttress of the river, the river itself. Method
continued to paint the sky: (colors: titanium white, ultramarine blue clear lacquer Garanza, permanent violet). With first I painted blue patch of sky visible, adding lacquer have been covering the grayish areas, and finally the white areas of the nubes.he covered the entire sky, and then I've been qualifying and shaping the clouds all with the same brush bristle plano.La previous idea I had was to merge the contours with a clean brush, but in the end I have not taken that paso.Sin look, I have found little effect and plastic volume clouds, which underscore the monumentality of the cathedral.



tried to get a little gray, adding a touch of ivory black, but gives a color-white, gray aratonado inappropriate.



Cathedral: I've given another layer without oil, natural shade with soil, earth raw sienna and white lacquer. It is painted
the catedral.Ha been laborious because of the complexity of elements arquitectónicos.También I painted the wall of río.Solo lack the same river, which is like closing the circle, has to harmonize with heaven, but it is a river Sewage: There tierra.Dilema tones.
I painted the river twice, twice as I borrado.A the third has been more or less decente.La reference photo does not reflect well the colors, besides the Seine river water is sucias.He opted for a blue hue last photo is agrisado.La natural.Se light note .

Monday, October 4, 2010

Benzocaine Doesnt Work Premature




terminado.Colores Here is the chart used: titanium white, cadmium yellow, yellow ocher, vermilion, cadmium red, permanent rose, Phthalo Blue, black marfil.Tiempo at: about three horas.Primero, painted fruit + ear, then the background with ivory black mixed with the colors of the palette + blanco.Me like the composition (The apple on the left at odds). There is disharmony in color with gray background.